کیپیٹل اسمارٹ سٹی اوورسیز کیپٹل سمارٹ سٹی راولپنڈی میں 4 کمروں کا 5 مرلہ مکان 84.5 لاکھ میں برائے فروخت۔
کیپیٹل اسمارٹ سٹی اوورسیز، کیپٹل سمارٹ سٹی، راولپنڈی، پنجاب
4 بیڈ
4 باتھ
5 مرلہ
مجموعی جائزہ
تفصیلات
- قسممکان
- قیمتPKR84.5 لاکھ
- مقامکیپٹل سمارٹ سٹی، راولپنڈی، پنجاب
- باتھ4
- رقبہ5 مرلہ
- مقصدبرائے فروخت
- بیڈ4
- شامل کی1 سال پہلے
تفصیل
5 marla 84.50 lac villa available in capital smart city
down payment is paid 40 lacs.
call now.
To overcome the need for water in society, four tube wells are fully operational. Above 200 heavy pieces of machinery are used on the site for development work.
The development work at the overseas and executive block in society was given a priority and now is expanded to other parts of society. Now let s talk in-depth about the significant development status of society.
Carpeted Network of Roads
The construction work of the network of carpeted roads has been accomplished to make transportation and traveling in society convenient. Construction work of 300 feet long main Boulevard is also completed and operational.
Site-02 & 03 Overseas Block Area 1 & 2
According to the latest development work in society, the progress work has commenced, and the latest development can be significantly seen after completing the initial plotting and earthwork. The work on the infrastructure is ongoing at the site.
The construction work of the sector mosque, the framework for shaft, curb stone, and saucer drain, has been completed in the overseas block.
down payment is paid 40 lacs.
call now.
To overcome the need for water in society, four tube wells are fully operational. Above 200 heavy pieces of machinery are used on the site for development work.
The development work at the overseas and executive block in society was given a priority and now is expanded to other parts of society. Now let s talk in-depth about the significant development status of society.
Carpeted Network of Roads
The construction work of the network of carpeted roads has been accomplished to make transportation and traveling in society convenient. Construction work of 300 feet long main Boulevard is also completed and operational.
Site-02 & 03 Overseas Block Area 1 & 2
According to the latest development work in society, the progress work has commenced, and the latest development can be significantly seen after completing the initial plotting and earthwork. The work on the infrastructure is ongoing at the site.
The construction work of the sector mosque, the framework for shaft, curb stone, and saucer drain, has been completed in the overseas block.
مقام اور سفر
کیپیٹل اسمارٹ سٹی اوورسیز کا نقشہ
قریبی مقامات
ہوم فنانس کیلکولیٹر
اس مکان پر ماہانہ قرض کا اندازہ لگائیے۔
روایتی
سود کی تدبیر
گھر سہولت سکیم
ملازمت کی صورتحال
تنخواہ دار
پراپرٹی قیمت
PKR
قرض کی مدت
سال
بیعانہ
%
PKRسود کی شرح
%
ماہانہ قسطPKR83.88 ہزار
بینک فنانس کی رقمPKR59.15 لاکھ
ادائیگی کی ترتیب
سود کی رقماصل رقم